• Gardanotes
  • About Us
  • Contacts
  • Privacy Policy
  • Login
gardanotes.com
  • Breaking News
  • Culture
  • Entertainment
  • Insights
No Result
View All Result
  • Breaking News
  • Culture
  • Entertainment
  • Insights
No Result
View All Result
gardanotes.com
No Result
View All Result
Home Insights

Adjustment Intervention of the Overflow in Peschiera del Garda

19 May 2025
in Insights, Peschiera
Reading Time: 2 mins read
Share on FacebookShare on Twitter

In Peschiera del Garda, the Gardesana Servizi Company (AGS) has initiated a significant intervention for environmental protection, involving the upgrade of the overflow sewer located on Lungomincio Bonomi. This initiative, with a total investment of €273,000, is part of a broader project aimed at complying with environmental regulations and the regional plan for improving mixed sewer networks.

### Details of the Intervention

The president of AGS, Angelo Cresco, emphasized the importance of this upgrade: “The compliance of overflow sewers is undoubtedly significant for environmental protection and territorial safeguarding.” This intervention is crucial for ensuring sustainable water management and reducing the environmental impact resulting from intense meteorological events.

The overflow in question manages mixed waters coming from various surrounding areas, including Cavalcaselle and Mandella. To optimize the operation of the facility, planned works include reshaping the incoming pipe through the replacement of the current tubing.

![AGS Overflow Peschiera](https://www.gardanotizie.it/wp-content/uploads/2025/05/AGS-Sfioratore-Peschiera-4-1024×682.jpeg)

### Technological Innovations

The project also includes the creation of a new structure equipped with an advanced system for treating overflow water. This technology is designed to retain suspended solids during heavy rainfall. Additionally, a bypass will be implemented to facilitate maintenance operations, both routine and extraordinary.

Carlo Alberto Voi, the general director of AGS, highlighted that “the project’s primary goal is to provide a definitive solution to long-standing issues regarding the actual quality and quantity of water discharged into the Mincio River.” The new structure will feature an innovative self-cleaning screw screen system that allows for efficient management of overflow water.

### Timeline and Conclusion of Works

The works will involve the demolition of existing old structures and the construction of a new underground facility to house updated electromechanical equipment. All connected hydraulic pipes will be replaced, and a new bypass pipe will be constructed to ensure safe operations.

To further enhance environmental protection, a sedimentation compartment will be added upstream of the overflow, designed to capture coarser materials. The works are scheduled to be completed before the start of summer, thus contributing to the environmental protection of the area surrounding the lake.
Italian Version

Previous Post

Meetings with Authors in Desenzano del Garda: Culture and Literature on Display

Next Post

Treasure Hunt in Sirmione: Spring Party for Kids

Next Post

Treasure Hunt in Sirmione: Spring Party for Kids

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • Gardanotes
  • About Us
  • Contacts
  • Privacy Policy

© 2024 Gardanotes is the English version of Gardanotizie, the first online daily of Lake Garda. Registered with the Tribunal of Brescia, No. 35/2000 (16/06/2000). Director: Luca Delpozzo.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In
No Result
View All Result
  • Home
  • Breaking News
  • Entertainment
  • Insights

© 2024 Gardanotes is the English version of Gardanotizie, the first online daily of Lake Garda. Registered with the Tribunal of Brescia, No. 35/2000 (16/06/2000). Director: Luca Delpozzo.

Go to mobile version